ITAC Assessment: UL2503
ITAC logo
ITAC Assessment: UL2503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Clothing
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 141,441
ft2
Annual Production 288,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,426 1,091,700
kWh
Electricity Demand $116,132 5,076
kW-mo/yr
Electricity Fees $29,378 -
Natural Gas $28,960 3,086
MMBtu
TOTAL YEARLY COSTS $211,896
RECOMMENDED SAVINGS* $84,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,701 $2,100 $4,701
138,264
kWh
- - -
02 2.3212: Optimize plant power factor $6,739 $14,223 - - $6,739 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $17,129 $32,120 $3,314
96,611
kWh
$13,815
-
kW-mo/yr
- -
04 2.9114: Use solar heat to make electricty $53,722 $482,406 $25,084
737,775
kWh
$28,638
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $2,094 $7,500 - - - $2,094
-
MMBtu
TOTAL RECOMMENDED $84,385 $538,349 $33,099
972,650
kWh
$42,453
-
kW-mo/yr
$6,739 $2,094
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs