Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product elevators and escalators
NAICS
n/a
SIC 3534: Elevators and Moving Stairways
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 240,000
ft2
Annual Production 78
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,766 4,033,998
kWh
Natural Gas $86,920 15,454
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $7,448 - n/a $7,448
389,801
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,640 $250 n/a $8,640
-
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,786 $3,000 n/a $8,454
147,714
kWh
$2,332
-
MMBtu
04 2.7131: Add area lighting switches $2,496 $200 n/a $2,496
43,669
kWh
-
05 2.7131: Add area lighting switches $1,454 $200 n/a $1,454
29,015
kWh
-
TOTAL RECOMMENDED $30,824 $3,650 $28,492
610,199
kWh
$2,332
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs