ITAC Assessment: UU0211
ITAC logo
ITAC Assessment: UU0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial Apparel and Services
NAICS 315280: Other Cut and Sew Apparel Manufacturing
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 2,000
ft2
Annual Production 5,500,000
lb
Production Hrs. Annual 2,100
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,959 387,760
kWh
Electricity Demand $35,575 2,155
kW-mo/yr
Natural Gas $111,545 14,981
MMBtu
Waste Disposal Costs
Water Usage $37,019 11,216
Tgal
Water Disposal $9,717 11,216
Tgal
TOTAL YEARLY COSTS $207,815
RECOMMENDED SAVINGS* $60,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1224: Replace boiler $24,600 $111,300 - - $24,600
-
MMBtu
-
02 2.8113: Purchase gas directly from a contract gas supplier $22,030 $18,300 - - - $22,030
03 4.811: Demolish old building to reduce tax and insurance bills $7,263 $12,600 - - - $7,263
04 2.2444: Use hot process fluids to preheat incoming process fluids $3,351 $26,250 - - $3,351
-
MMBtu
-
05 2.3212: Optimize plant power factor $2,330 $6,230 - - - $2,330
06 2.4221: Install compressor air intakes in coolest locations $433 $3,100 $277
7,670
kWh
$156
-
kW-mo/yr
- -
TOTAL RECOMMENDED $60,007 $177,780 $277
7,670
kWh
$156
-
kW-mo/yr
$27,951
-
MMBtu
$31,623
TOTAL IMPLEMENTED $27,951 $137,550 - - $27,951
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs