ITAC Assessment: OR0354
ITAC logo
ITAC Assessment: OR0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Imitation crab meat
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 24,800
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 4,986
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,865 1,296,600
kWh
Electricity Demand $7,577 59,016
kW-mo/yr
Electricity Fees $1,106 -
Natural Gas $69,992 13,775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2153: Close off unneeded steam lines $5,250 $950 - - $5,250
-
MMBtu
-
02 2.2163: Use minimum steam operating pressure $560 - - - $560
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $750 $500 - - $750
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $661 $2,049 $539
16,120
kWh
$61
-
kW-mo/yr
- $61
05 2.2621: Modify refrigeration system to operate at a lower pressure $950 - $950
28,429
kWh
- - -
TOTAL RECOMMENDED $8,171 $3,499 $1,489
44,549
kWh
$61
-
kW-mo/yr
$6,560
-
MMBtu
$61
TOTAL IMPLEMENTED $6,661 $3,499 $539
16,120
kWh
$61
-
kW-mo/yr
$6,000
-
MMBtu
$61
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs