ITAC Assessment: SF0588
ITAC logo
ITAC Assessment: SF0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Watersports wear, Kayaking Equipment
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2385: Waterproof Outerwear
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 29,000
ft2
Annual Production 35,000
units
Production Hrs. Annual 3,432
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,963 319,601
kWh
Electricity Demand $11,646 775
kW-mo/yr
Natural Gas $18,783 1,084
MMBtu
TOTAL YEARLY COSTS $104,392
RECOMMENDED SAVINGS* $47,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
01 2.2511: Insulate bare equipment $8,477 $5,558 $8,477
36,633
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,344 $4,967 $1,551
6,701
kWh
$793
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $621 $1,515 $621
2,679
kWh
- - -
04 2.8112: Combine utility meters $7,304 $15,000 - $(-4,207.0)
-
kW-mo/yr
$3,204 $8,307
05 2.9114: Use solar heat to make electricty $28,848 $137,044 $28,848
124,666
kWh
- - -
TOTAL RECOMMENDED $47,594 $164,084 $39,497
170,679
kWh
$(-3,414.0)
-
kW-mo/yr
$3,204 $8,307
TOTAL IMPLEMENTED $11,442 $12,040 $10,649
46,013
kWh
$793
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs