| Assessment Year | 1988 |
|---|---|
| Principal Product | ANIMAL & POULTRY FEED |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
n/a
|
| Annual Production | 50,000
ton
|
| Production Hrs. Annual | 3,110
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $116,639 | 1,046,600 |
kWh
|
$0.11 |
| Natural Gas | $67,763 | 18,268 |
MMBtu
|
$3.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,037 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,845 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,130 | $2,000 | - |
$6,130
-
MMBtu
|
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $6,044 | $8,000 | - |
$6,044
-
MMBtu
|
|
| 03 | 2.2163: Use minimum steam operating pressure | $148 | $25 | - |
$148
-
MMBtu
|
|
| 04 | 2.2136: Install / repair insulation on steam lines | $522 | $700 | - |
$522
-
MMBtu
|
|
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,193 | $500 |
$1,193
-
kWh
|
- | |
| TOTAL RECOMMENDED | $14,037 | $11,225 |
$1,193
-
kWh
|
$12,844
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,845 | $3,200 |
$1,193
-
kWh
|
$6,652
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs