ITAC Assessment: OK0818
ITAC logo
ITAC Assessment: OK0818
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Heavy duty pick up truck for recreational towing
NAICS 423110: Automobile and Other Motor Vehicle Merchant Wholesalers
SIC 5012: Automobiles and Other Motor Vehicles
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 308,000
ft2
Annual Production 96
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,547 792,308
kWh
Natural Gas $29,450 4,598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $8,413 $91,000 $745
9,310
kWh
$7,668
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,735 $29,626 $2,735
34,191
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,786 $40,503 $4,786
59,820
kWh
-
04 2.7135: Install occupancy sensors $309 $2,707 $309
3,857
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,726 $1,635 $1,726
21,580
kWh
-
06 2.2437: Recover waste heat from equipment $1,355 $4,015 - $1,355
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $535 $386 $535
6,682
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $482 $2,104 $482
6,026
kWh
-
09 2.9121: Install wind powered electric generator $17,200 $168,000 $17,200
240,000
kWh
-
TOTAL RECOMMENDED $37,541 $339,976 $28,518
381,466
kWh
$9,023
-
MMBtu
TOTAL IMPLEMENTED $10,621 $94,739 $2,953
36,916
kWh
$7,668
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs