ITAC Assessment: UU0246
ITAC logo
ITAC Assessment: UU0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Socks, Belts, Wallets
NAICS 315990: Apparel Accessories and Other Apparel Manufacturing
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 27
Plant Area 60,000
ft2
Annual Production 92,900
units
Production Hrs. Annual 7,056
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,684 743,800
kWh
Electricity Demand $44,880 2,759
kW-mo/yr
Electricity Fees $16,512 -
Natural Gas $13,133 1,075
MMBtu
TOTAL YEARLY COSTS $101,209
RECOMMENDED SAVINGS* $21,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $439 $900 - $439
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $3,514 $9,000 - - $3,514
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,628 $3,000 $1,052
29,300
kWh
$576
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $520 $123 $325
8,900
kWh
$195
-
kW-mo/yr
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,731 $338 $1,731
48,090
kWh
- -
06 2.9114: Use solar heat to make electricty $8,970 $42,406 $6,172
172,022
kWh
$2,798
-
kW-mo/yr
-
07 3.1194: Use automatic flow control $4,727 $4,633 $2,189
60,803
kWh
$2,538
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,529 $60,400 $11,469
319,115
kWh
$6,546
-
kW-mo/yr
$3,514
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs