Assessment Year | 2005 |
---|---|
Principal Product | Concrete blocks and ready mix concrete |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3271: Concrete Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
70,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,397 | 729,672 |
kWh
|
$0.033 |
Electricity Demand | $21,509 | 3,284 |
kW-mo/yr
|
$6.55 |
Natural Gas | $33,313 | 3,922 |
MMBtu
|
$8.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,966 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4131: Size electric motors for peak operating efficiency | $4,470 | $3,000 |
$2,505
75,000
kWh
|
$1,965
-
kW-mo/yr
|
- | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $1,086 | $2,000 |
$608
18,210
kWh
|
$478
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $400 | $200 |
$225
6,740
kWh
|
$175
-
kW-mo/yr
|
- | - | - | |
04 | 2.4151: Develop a repair/replace policy | $38 | $28 |
$21
625
kWh
|
$17
-
kW-mo/yr
|
- | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $1,036 | $1,770 | - | - |
$1,036
-
MMBtu
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $495 | $50 |
$140
4,200
kWh
|
$110
-
kW-mo/yr
|
- | - | $245 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $149 | $249 |
$79
2,373
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,379 | $2,200 |
$379
11,355
kWh
|
$298
-
kW-mo/yr
|
- | $519 | $183 | |
TOTAL RECOMMENDED | $9,053 | $9,497 |
$3,957
118,503
kWh
|
$3,113
-
kW-mo/yr
|
$1,036
-
MMBtu
|
$519 | $428 | ||
TOTAL IMPLEMENTED | $1,966 | $2,677 |
$704
21,093
kWh
|
$560
-
kW-mo/yr
|
- | $519 | $183 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs