ITAC Assessment: NC0329
ITAC logo
ITAC Assessment: NC0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Concrete blocks and ready mix concrete
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,397 729,672
kWh
Electricity Demand $21,509 3,284
kW-mo/yr
Natural Gas $33,313 3,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,966

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4131: Size electric motors for peak operating efficiency $4,470 $3,000 $2,505
75,000
kWh
$1,965
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $1,086 $2,000 $608
18,210
kWh
$478
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $400 $200 $225
6,740
kWh
$175
-
kW-mo/yr
- - -
04 2.4151: Develop a repair/replace policy $38 $28 $21
625
kWh
$17
-
kW-mo/yr
- - -
05 2.2136: Install / repair insulation on steam lines $1,036 $1,770 - - $1,036
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $495 $50 $140
4,200
kWh
$110
-
kW-mo/yr
- - $245
07 2.7142: Utilize higher efficiency lamps and/or ballasts $149 $249 $79
2,373
kWh
$70
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,379 $2,200 $379
11,355
kWh
$298
-
kW-mo/yr
- $519 $183
TOTAL RECOMMENDED $9,053 $9,497 $3,957
118,503
kWh
$3,113
-
kW-mo/yr
$1,036
-
MMBtu
$519 $428
TOTAL IMPLEMENTED $1,966 $2,677 $704
21,093
kWh
$560
-
kW-mo/yr
- $519 $183
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs