Assessment Year | 2016 |
---|---|
Principal Product | Waste Water Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 50 |
Plant Area |
900,000
ft2
|
Annual Production | 3,285,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $567,697 | 6,381,840 |
kWh
|
$0.089 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,205,745 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,665 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $9,700 | $6,000 |
$9,700
109,000
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $144,770 | $285,230 |
$144,770
1,626,660
kWh
|
- | |
03 | 2.3322: Use existing dam to generate electricity | $6,400 | $28,700 |
$6,400
71,880
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,215 | $58,570 |
$12,215
137,230
kWh
|
- | |
05 | 2.9141: Install anaerobic digester | $990,000 | $6,000,000 | - |
$990,000
-
lb
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,450 | $21,270 |
$2,450
27,525
kWh
|
- | |
07 | 2.1336: Install equipment to utilize waste fuel | $40,210 | $390,000 |
$40,210
451,820
kWh
|
- | |
TOTAL RECOMMENDED | $1,205,745 | $6,789,770 |
$215,745
2,424,115
kWh
|
$990,000
-
lb
|
||
TOTAL IMPLEMENTED | $14,665 | $79,840 |
$14,665
164,755
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs