ITAC Assessment: DL0161
ITAC logo
ITAC Assessment: DL0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 50
Plant Area 900,000
ft2
Annual Production 3,285,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $567,697 6,381,840
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,205,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.6231: Utilize controls to operate equipment only when needed $9,700 $6,000 $9,700
109,000
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $144,770 $285,230 $144,770
1,626,660
kWh
-
03 2.3322: Use existing dam to generate electricity $6,400 $28,700 $6,400
71,880
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,215 $58,570 $12,215
137,230
kWh
-
05 2.9141: Install anaerobic digester $990,000 $6,000,000 - $990,000
-
lb
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,450 $21,270 $2,450
27,525
kWh
-
07 2.1336: Install equipment to utilize waste fuel $40,210 $390,000 $40,210
451,820
kWh
-
TOTAL RECOMMENDED $1,205,745 $6,789,770 $215,745
2,424,115
kWh
$990,000
-
lb
TOTAL IMPLEMENTED $14,665 $79,840 $14,665
164,755
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs