95
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OK0824 #09 Y:2012 | 09 | 2012 | Recover waste heat from equipment | $1,249 | $461 | |
OK0824 #08 Y:2012 | 08 | 2012 | Use proper thickness of insulation on building envelope | $6,045 | $162,500 | |
OK0824 #07 Y:2012 | 07 | 2012 | Utilize higher efficiency lamps and/or ballasts | $687 | $1,691 | |
OK0824 #06 Y:2012 | 06 | 2012 | Utilize higher efficiency lamps and/or ballasts | $787 | $4,095 | |
OK0824 #05 Y:2012 | 05 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,772 | $8,055 | |
OK0824 #04 Y:2012 | 04 | 2012 | Install occupancy sensors | $2,183 | $8,237 | |
OK0824 #03 Y:2012 | 03 | 2012 | Improve air circulation with destratification fans / other methods | $9,127 | $23,400 | |
OK0824 #02 Y:2012 | 02 | 2012 | Install outside air damper / economizer on hvac unit | $21,096 | $22,080 | |
OK0824 #01 Y:2012 | 01 | 2012 | Use computer programs to optimize hvac performance | $17,721 | $31,152 | |
UU0089 #05 Y:2005 | 05 | 2005 | Analyze flue gas for proper air/fuel ratio | $10,700 | $2,000 | |
UU0089 #04 Y:2005 | 04 | 2005 | Air condition only space necessary | $33,020 | $2,085 | |
UU0089 #03 Y:2005 | 03 | 2005 | Use waste heat from hot flue gases to preheat | $17,940 | $21,000 | |
UU0089 #02 Y:2005 | 02 | 2005 | Preheat combustion air with waste heat | $1,820 | $1,500 | |
UU0089 #01 Y:2005 | 01 | 2005 | Optimize plant power factor | $1,110 | $4,290 | |
UU0090 #04 Y:2005 | 04 | 2005 | Install compressor air intakes in coolest locations | $1,040 | $500 | |
UU0090 #03 Y:2005 | 03 | 2005 | Recover waste heat from equipment | $4,540 | $5,920 | |
UU0090 #02 Y:2005 | 02 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,520 | $4,570 | |
UU0090 #01 Y:2005 | 01 | 2005 | Air condition only space necessary | $11,500 | $225 | |
SF0158 #04 Y:1998 | 04 | 1998 | Increase amount of waste recovered for resale | $7,327 | $125 | |
SF0158 #03 Y:1998 | 03 | 1998 | Replace electrically-operated equipment with fossil fuel equipment | $1,087 | $4,159 |