ITAC Assessment: OK0824
ITAC logo
ITAC Assessment: OK0824
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Shape wear
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2341: Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales Range $50
M
to 100
M
# of Employees 147
Plant Area 130,000
ft2
Annual Production 715,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,376 1,191,600
kWh
Natural Gas $43,042 5,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $17,721 $31,152 $9,110
93,922
kWh
$8,611
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $21,096 $22,080 $21,096
217,486
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $9,127 $23,400 $1,693
17,454
kWh
$7,434
-
MMBtu
04 2.7135: Install occupancy sensors $2,183 $8,237 $2,183
22,512
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,772 $8,055 $2,772
28,578
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $787 $4,095 $787
8,117
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $687 $1,691 $687
7,092
kWh
-
08 2.7492: Use proper thickness of insulation on building envelope $6,045 $162,500 $679
7,005
kWh
$5,366
-
MMBtu
09 2.2437: Recover waste heat from equipment $1,249 $461 - $1,249
-
MMBtu
TOTAL RECOMMENDED $61,667 $261,671 $39,007
402,166
kWh
$22,660
-
MMBtu
TOTAL IMPLEMENTED $10,291 $176,341 $4,925
50,792
kWh
$5,366
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs