ITAC Assessment: SF0158
ITAC logo
ITAC Assessment: SF0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Knit Garments
NAICS
n/a
SIC 2343:
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 25,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,986 170,868
kWh
Natural Gas $2,712 371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $896 $1,474 $896
7,620
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,055 $15,240 $5,055
43,083
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,087 $4,159 $1,321
11,137
kWh
$(-234.0)
-
MMBtu
-
04 3.5313: Increase amount of waste recovered for resale $7,327 $125 - - $7,327
-
lb
TOTAL RECOMMENDED $14,365 $20,998 $7,272
61,840
kWh
$(-234.0)
-
MMBtu
$7,327
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs