Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,441

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Apparel and other finished products made from fabrics and similar materials
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0371 #05 Y:1988 Use most efficient type of electric motors $66 $75
GT0371 #04 Y:1988 Utilize energy-efficient belts and other improved mechanisms $185 -
GT0371 #03 Y:1988 Install compressor air intakes in coolest locations $185 $75
GT0371 #02 Y:1988 Install vinyl strip / high speed / air curtain doors $2,150 $3,460
GT0371 #01 Y:1988 Utilize higher efficiency lamps and/or ballasts $4,140 $10,175
TN0365 #13 Y:1988 Change rate schedules or other changes in utility service $2,286 -
TN0365 #12 Y:1988 Conserve energy by efficient use of vending machines $157 $385
TN0365 #11 Y:1988 Install / repair insulation on condensate lines $38 $30
TN0365 #10 Y:1988 Utilize higher efficiency lamps and/or ballasts $1,100 $616
TN0365 #09 Y:1988 Utilize energy-efficient belts and other improved mechanisms $294 -
TN0365 #08 Y:1988 Reduce the pressure of compressed air to the minimum required $334 $250
TN0365 #07 Y:1988 Analyze flue gas for proper air/fuel ratio $95 $1,700
TN0365 #06 Y:1988 Close off unneeded steam lines $118 $210
TN0365 #05 Y:1988 Insulate bare equipment $223 $270
TN0365 #04 Y:1988 Use minimum steam operating pressure $384 -
TN0365 #03 Y:1988 Analyze flue gas for proper air/fuel ratio $431 $225
TN0365 #02 Y:1988 Install / repair insulation on steam lines $503 $447
TN0365 #01 Y:1988 Keep boiler tubes clean $1,406 $320
KU0274 #06 Y:1988 Reduce hot water temperature to the minimum required $251 -
KU0274 #05 Y:1988 Use or replace with energy efficient substitutes $700 $3,700