| Assessment Year | 1989 |
|---|---|
| Principal Product | WOMEN'S JEANS & PANTS |
| NAICS |
n/a
|
| SIC | 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 527 |
| Plant Area |
n/a
|
| Annual Production | 2,300,000
pieces
|
| Production Hrs. Annual | 3,920
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $186,701 | 2,670,574 |
kWh
|
$0.070 |
| Fuel Oil #2 | $17,739 | 4,600 |
MMBtu
|
$3.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,969 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,178 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $3,190 | $900 | - |
$3,190
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,741 | $2,300 |
$12,741
182,005
kWh
|
- | - | |
| 03 | 2.2153: Close off unneeded steam lines | $567 | - | - |
$567
-
MMBtu
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,093 | $2,150 |
$2,093
29,894
kWh
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $(-88.0) | - | - |
$212
-
MMBtu
|
$(-300.0) | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $344 | $144 |
$344
4,982
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $147 | $261 | - |
$147
-
MMBtu
|
- | |
| 08 | 2.4312: Improve lubrication practices | $759 | $1,800 |
$759
10,844
kWh
|
- | - | |
| 09 | 2.2136: Install / repair insulation on steam lines | $143 | $289 | - |
$143
-
MMBtu
|
- | |
| 10 | 2.2122: Install / repair insulation on condensate lines | $73 | $40 | - |
$73
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $19,969 | $7,884 |
$15,937
227,725
kWh
|
$4,332
-
MMBtu
|
$(-300.0) | ||
| TOTAL IMPLEMENTED | $15,178 | $4,594 |
$15,178
216,881
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs