ITAC Assessment: TN0359
ITAC logo
ITAC Assessment: TN0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WOMEN'S JEANS & PANTS
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 527
Plant Area
n/a
Annual Production 2,300,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,701 2,670,574
kWh
Fuel Oil #2 $17,739 4,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2135: Repair and eliminate steam leaks $3,190 $900 - $3,190
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,741 $2,300 $12,741
182,005
kWh
- -
03 2.2153: Close off unneeded steam lines $567 - - $567
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,093 $2,150 $2,093
29,894
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $(-88.0) - - $212
-
MMBtu
$(-300.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $344 $144 $344
4,982
kWh
- -
07 2.2511: Insulate bare equipment $147 $261 - $147
-
MMBtu
-
08 2.4312: Improve lubrication practices $759 $1,800 $759
10,844
kWh
- -
09 2.2136: Install / repair insulation on steam lines $143 $289 - $143
-
MMBtu
-
10 2.2122: Install / repair insulation on condensate lines $73 $40 - $73
-
MMBtu
-
TOTAL RECOMMENDED $19,969 $7,884 $15,937
227,725
kWh
$4,332
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $15,178 $4,594 $15,178
216,881
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs