| Assessment Year | 2023 |
|---|---|
| Principal Product | Relay Panels, Switchgear and Enclosures |
| NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
| SIC | 3613: Switchgear and Switchboard Apparatus |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
88,000
ft2
|
| Annual Production | 1,224
units
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,985 | 939,450 |
kWh
|
$0.11 |
| Electricity Demand | $102,225 | 2,716 |
kW-mo/yr
|
$37.64 |
| Electricity Fees | $11,070 | - |
|
- |
| TOTAL YEARLY COSTS | $216,280 | |||
| RECOMMENDED SAVINGS* | $179,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,027 | $20,044 |
$10,523
96,010
kWh
|
$3,504
-
kW-mo/yr
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $2,908 | $5,515 |
$2,408
21,975
kWh
|
$500
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,560 | $10,840 |
$2,906
26,513
kWh
|
$2,604
-
kW-mo/yr
|
$50 | |
| 04 | 2.9114: Use solar heat to make electricty | $55,997 | $84,760 |
$23,476
214,200
kWh
|
$32,521
-
kW-mo/yr
|
- | |
| 05 | 2.3141: Use battery storage for demand control | $48,532 | - |
$(-2,959.2)
(-27,000)
kWh
|
$51,492
-
kW-mo/yr
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,170 | $3,900 |
$1,628
14,850
kWh
|
$542
-
kW-mo/yr
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $520 | $1,694 |
$208
1,898
kWh
|
$312
-
kW-mo/yr
|
- | |
| 08 | 2.3132: Recharge batteries on during off-peak demand periods | $49,587 | - | - |
$49,587
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $179,301 | $126,753 |
$38,190
348,446
kWh
|
$141,061
-
kW-mo/yr
|
$50 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs