ITAC Assessment: MZ0250
ITAC logo
ITAC Assessment: MZ0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product glass foam insulation
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 1,733,864
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 8,520
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,374,123 25,940,000
kWh
Electricity Demand $233,280 40,080
kW-mo/yr
Natural Gas $2,519,518 566,020
MMBtu
Waste Disposal Costs
Water Usage $196,938 7,294,001
Tgal
TOTAL YEARLY COSTS $4,323,859
RECOMMENDED SAVINGS* $51,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,834

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,351 $5,600 - - $2,351
-
MMBtu
02 2.2437: Recover waste heat from equipment $27,014 $65,000 - - $27,014
-
MMBtu
03 2.7135: Install occupancy sensors $1,786 $280 $1,537
29,008
kWh
$249
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $20,697 - $17,941
338,502
kWh
$2,756
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,848 $70,880 $19,478
367,510
kWh
$3,005
-
kW-mo/yr
$29,365
-
MMBtu
TOTAL IMPLEMENTED $24,834 $5,880 $19,478
367,510
kWh
$3,005
-
kW-mo/yr
$2,351
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs