ITAC Assessment: AR0115
ITAC logo
ITAC Assessment: AR0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Continuous Snap Forms
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 80,139
ft2
Annual Production 3,780,249
lb
Production Hrs. Annual 4,588
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,440 3,077,081
kWh
Electricity Demand $123,711 7,278
kW-mo/yr
Natural Gas $23,073 4,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $227,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,924 $1,110 $1,451
52,755
kWh
$2,473
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $593 $593 $252
9,086
kWh
$341
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,749 $210 $791
28,722
kWh
$958
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $735 $15 $379
13,775
kWh
$356
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $591 $500 $69
2,638
kWh
$522
-
kW-mo/yr
- -
06 2.3136: Overlap custodial services with normal day hours $129 $100 $129
4,689
kWh
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $81,000 $51,950 - - $81,000
-
lb
-
08 3.1191: Change procedures / equipment / operating conditions $116,819 $18,225 - - $116,819
-
lb
-
09 4.431: Train operators for maximum operating efficiency $21,754 - - - - $21,754
TOTAL RECOMMENDED $227,294 $72,703 $3,071
111,665
kWh
$4,650
-
kW-mo/yr
$197,819
-
lb
$21,754
TOTAL IMPLEMENTED $145,574 $20,153 $2,873
104,338
kWh
$4,128
-
kW-mo/yr
$116,819
-
lb
$21,754
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs