ITAC Assessment: GT0371
ITAC logo
ITAC Assessment: GT0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TYVEX COVERALLS
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $10
M
to 50
M
# of Employees 213
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,276 579,132
kWh
Natural Gas $4,858 847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,140 $10,175 $4,140
58,617
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,150 $3,460 - $2,150
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $185 $75 $185
2,638
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $185 - $185
3,224
kWh
-
05 2.4133: Use most efficient type of electric motors $66 $75 $66
879
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,466 - $1,466
21,102
kWh
-
TOTAL RECOMMENDED $8,192 $13,785 $6,042
86,460
kWh
$2,150
-
MMBtu
TOTAL IMPLEMENTED $4,576 $10,325 $4,576
65,358
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs