matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0211 #06 Y:2022 | 06 | 2022 | Install compressor air intakes in coolest locations | $433 | $3,100 | |
| UU0211 #05 Y:2022 | 05 | 2022 | Optimize plant power factor | $2,330 | $6,230 | |
| UU0211 #04 Y:2022 | 04 | 2022 | Use hot process fluids to preheat incoming process fluids | $3,351 | $26,250 | |
| UU0211 #03 Y:2022 | 03 | 2022 | Demolish old building to reduce tax and insurance bills | $7,263 | $12,600 | |
| UU0211 #02 Y:2022 | 02 | 2022 | Purchase gas directly from a contract gas supplier | $22,030 | $18,300 | |
| UU0211 #01 Y:2022 | 01 | 2022 | Replace boiler | $24,600 | $111,300 | |
| SF0588 #05 Y:2022 | 05 | 2022 | Use solar heat to make electricty | $28,848 | $137,044 | |
| SF0588 #04 Y:2022 | 04 | 2022 | Combine utility meters | $7,304 | $15,000 | |
| SF0588 #03 Y:2022 | 03 | 2022 | Eliminate or reduce compressed air usage | $621 | $1,515 | |
| SF0588 #02 Y:2022 | 02 | 2022 | Reduce the pressure of compressed air to the minimum required | $2,344 | $4,967 | |
| SF0588 #01 Y:2022 | 01 | 2022 | Insulate bare equipment | $8,477 | $5,558 | |
| MU0014 #09 Y:2022 | 09 | 2022 | Recover waste heat from equipment | $91 | $261 | |
| MU0014 #08 Y:2022 | 08 | 2022 | Turn off equipment when not in use | $109 | - | |
| MU0014 #07 Y:2022 | 07 | 2022 | Turn off equipment when not in use | $414 | $349 | |
| MU0014 #06 Y:2022 | 06 | 2022 | Use optimum temperature | $1,469 | $155 | |
| MU0014 #05 Y:2022 | 05 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,680 | $4,307 | |
| MU0014 #04 Y:2022 | 04 | 2022 | Clean and maintain refrigerant condensers and towers | $6,530 | - | |
| MU0014 #03 Y:2022 | 03 | 2022 | Reduce the pressure of compressed air to the minimum required | $8,023 | - | |
| MU0014 #02 Y:2022 | 02 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,203 | $4,540 | |
| MU0014 #01 Y:2022 | 01 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $32,107 | $30,064 |