Assessment Year | 2023 |
---|---|
Principal Product | Awnings and winstops |
NAICS | 314910: Textile Bag and Canvas Mills |
SIC | 2394: Canvas and Related Products |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
150,000
ft2
|
Annual Production | 16,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,729 | 865,829 |
kWh
|
$0.061 |
Electricity Demand | $26,479 | 2,970 |
kW-mo/yr
|
$8.92 |
Electricity Fees | $9,650 | - |
|
- |
Natural Gas | $61,027 | 7,194 |
MMBtu
|
$8.48 |
TOTAL YEARLY COSTS | $149,885 | |||
RECOMMENDED SAVINGS* | $7,984 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,197 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $856 | - |
$856
14,040
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,461 | $100 |
$1,217
19,951
kWh
|
$244
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,846 | $4,210 |
$1,407
23,065
kWh
|
$439
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $890 | $2,400 |
$626
10,265
kWh
|
$264
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,345 | $4,836 |
$946
15,517
kWh
|
$399
-
kW-mo/yr
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $1,586 | $8,304 |
$1,053
17,275
kWh
|
$533
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $7,984 | $19,850 |
$6,105
100,113
kWh
|
$1,879
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $4,197 | $6,710 |
$3,250
53,281
kWh
|
$947
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs