Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

527

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dyeing and finishing textiles, except wool fabrics
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0307 #02 Y:2016 Utilize a less expensive cooling method $10,877 $56,000
MI0307 #01 Y:2016 Turn off equipment when not in use $12,345 $3,600
MA0766 #06 Y:2016 Install / repair insulation on steam lines $3,894 $2,462
MA0766 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $4,855 $2,000
MA0766 #04 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $6,247 $8,325
MA0766 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $6,571 $1,000
MA0766 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $9,210 $50,500
MA0766 #01 Y:2016 Analyze flue gas for proper air/fuel ratio $13,264 $57,500
MA0729 #06 Y:2014 Reduce the pressure of compressed air to the minimum required $1,173 $200
MA0729 #05 Y:2014 Install / repair insulation on steam lines $2,622 $2,690
MA0729 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $8,114 $9,050
MA0729 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $8,956 $3,300
MA0729 #02 Y:2014 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $14,490 $500
MA0729 #01 Y:2014 Use heat from boiler blowdown to preheat boiler feed water $25,718 $11,750
NC0499 #14 Y:2013 Develop a repair/replace policy $2,055 $4,256
NC0499 #13 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $2,510 $100
NC0499 #12 Y:2013 Utilize higher efficiency lamps and/or ballasts $2,194 $451
NC0499 #11 Y:2013 Install occupancy sensors $3,113 $3,202
NC0499 #10 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,040 $12,800
NC0499 #09 Y:2013 Utilize higher efficiency lamps and/or ballasts $8,448 $18,119