Assessment Year | 2014 |
---|---|
Principal Product | printed fabric |
NAICS | 313310: Textile and Fabric Finishing Mills |
SIC | 2261: Finishers of Broadwoven Fabrics of Cotton |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
246,300
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $467,238 | 3,853,400 |
kWh
|
$0.12 |
Electricity Demand | $174,041 | 16,569 |
kW-mo/yr
|
$10.50 |
Electricity Fees | $42,650 | - |
|
- |
Natural Gas | $900,649 | 98,936 |
MMBtu
|
$9.10 |
Fuel Oil #6 | $11,663 | 669 |
MMBtu
|
$17.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,619 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $25,718 | $11,750 | - |
$8,172
-
MMBtu
|
$17,546
-
gal
|
|
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $14,490 | $500 |
$14,490
119,460
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,956 | $3,300 |
$8,956
73,836
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,114 | $9,050 |
$8,114
66,896
kWh
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $2,622 | $2,690 | - |
$2,622
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,173 | $200 |
$1,173
9,672
kWh
|
- | - | |
TOTAL RECOMMENDED | $61,073 | $27,490 |
$32,733
269,864
kWh
|
$10,794
-
MMBtu
|
$17,546
-
gal
|
||
TOTAL IMPLEMENTED | $24,619 | $4,000 |
$24,619
202,968
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs