| Assessment Year | 1995 |
|---|---|
| Principal Product | aluminum castings |
| NAICS |
n/a
|
| SIC | 3361: |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
32,000
ft2
|
| Annual Production | 1,872,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $62,600 | 1,952,227 |
kWh
|
$0.032 |
| Natural Gas | $75,451 | 22,691 |
MMBtu
|
$3.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $19,514 | $4,200 | n/a | - | - | - | $19,514 |
| 02 | 2.7261: Install timers and/or thermostats | $164 | $260 | n/a |
$120
3,810
kWh
|
$44
-
MMBtu
|
- | - |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $384 | $142 | n/a |
$384
12,016
kWh
|
- | - | - |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $569 | $252 | n/a |
$569
17,878
kWh
|
- | - | - |
| 05 | 2.7135: Install occupancy sensors | $219 | $535 | n/a |
$219
6,741
kWh
|
- | - | - |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $245 | $200 | n/a |
$245
7,620
kWh
|
- | - | - |
| 07 | 3.4151: Minimize water usage | $6,925 | $9,600 | n/a | - | - |
$6,925
-
Tgal
|
- |
| 08 | 3.4151: Minimize water usage | $2,308 | $100 | n/a | - | - |
$2,308
-
Tgal
|
- |
| TOTAL RECOMMENDED | $30,328 | $15,289 |
$1,537
48,065
kWh
|
$44
-
MMBtu
|
$9,233
-
Tgal
|
$19,514 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs