ITAC Assessment: DL0222
ITAC logo
ITAC Assessment: DL0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Custom metal, plastic parts and Systems
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 45,000
ft2
Annual Production 500
units
Production Hrs. Annual 3,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,453 219,381
kWh
Electricity Demand $9,961 1,173
kW-mo/yr
Electricity Fees $4,509 -
Natural Gas $8,571 726
MMBtu
Waste Disposal Costs
Water Usage $4,789 187
Tgal
TOTAL YEARLY COSTS $62,283
RECOMMENDED SAVINGS* $15,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 3.4156: Use flow control valves on equipment to optimize water use $1,009 $42 - - - $1,009
-
Tgal
02 2.6232: Install set-back timers $245 $130 $192
1,226
kWh
$53
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $338 $9,500 $266
1,692
kWh
$72
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $413 - - - $413
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $402 $871 $316
2,011
kWh
$86
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,097 $3,000 $861
5,488
kWh
$236
-
kW-mo/yr
- -
07 2.4226: Use / purchase optimum sized compressor $4,366 $25,000 $3,124
19,897
kWh
$895
-
kW-mo/yr
$347
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,152 $4,581 $4,782
30,455
kWh
$1,370
-
kW-mo/yr
- -
09 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $1,888 $2,450 - - $1,888
-
MMBtu
-
TOTAL RECOMMENDED $15,910 $45,574 $9,541
60,769
kWh
$2,712
-
kW-mo/yr
$2,648
-
MMBtu
$1,009
-
Tgal
TOTAL IMPLEMENTED $4,704 $34,500 $3,390
21,589
kWh
$967
-
kW-mo/yr
$347
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs