ITAC Assessment: OK0746
ITAC logo
ITAC Assessment: OK0746
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Baby Food
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range greater than $500
M
# of Employees 672
Plant Area 1,000,000
ft2
Annual Production 636,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,723,793 50,341,200
kWh
Natural Gas $6,645,358 670,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $328,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,655

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $32,026 $30,757 - - $32,026
-
MMBtu
02 2.9113: Use solar heat for heat $26,050 $140,000 - - $26,050
-
MMBtu
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $52,302 $14,800 - - $52,302
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $5,580 $4,541 $5,580
132,864
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,287 $3,000 $9,287
221,130
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $9,881 $3,256 $9,881
235,259
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $9,881 - $9,881
235,259
kWh
- -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $39,725 $63,500 $39,725
945,838
kWh
- -
09 2.1212: Operate boilers on high fire setting $49,382 $46,200 - - $49,382
-
MMBtu
10 2.1212: Operate boilers on high fire setting $40,383 $400 - - $40,383
-
MMBtu
11 2.3134: Shift from daytime to nighttime operation $30,387 $15,000 - $30,387
-
kW-mo/yr
-
12 2.9114: Use solar heat to make electricty $24,000 $840,000 $24,000
300,000
kWh
- -
TOTAL RECOMMENDED $328,884 $1,161,454 $98,354
2,070,350
kWh
$30,387
-
kW-mo/yr
$200,143
-
MMBtu
TOTAL IMPLEMENTED $66,655 $41,554 $34,629
824,512
kWh
- $32,026
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs