Assessment Year | 2016 |
---|---|
Principal Product | Farbric printing |
NAICS | 313310: Textile and Fabric Finishing Mills |
SIC | 2261: Finishers of Broadwoven Fabrics of Cotton |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
246,300
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 6,800
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $703,265 | 7,326,800 |
kWh
|
$0.096 |
Electricity Demand | $176,533 | 20,493 |
kW-mo/yr
|
$8.61 |
Electricity Fees | $10,800 | - |
|
- |
Natural Gas | $2,592,775 | 196,501 |
MMBtu
|
$13.19 |
TOTAL YEARLY COSTS | $3,483,373 | |||
RECOMMENDED SAVINGS* | $44,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,959 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,264 | $57,500 |
$9,711
101,156
kWh
|
$3,553
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,210 | $50,500 |
$9,210
95,934
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,571 | $1,000 |
$6,571
68,450
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,247 | $8,325 |
$6,247
65,076
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,855 | $2,000 |
$4,855
50,572
kWh
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $3,894 | $2,462 | - |
$3,894
-
MMBtu
|
|
TOTAL RECOMMENDED | $44,041 | $121,787 |
$36,594
381,188
kWh
|
$7,447
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,959 | $54,962 |
$14,065
146,506
kWh
|
$3,894
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs