ITAC Assessment: GT0685
ITAC logo
ITAC Assessment: GT0685
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 286,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $838,450 33,538,101
kWh
Electricity Demand $667,636 49,396
kW-mo/yr
Electricity Fees $36,702 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $317,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,280 - - - - - $5,280 -
02 3.5112: Reprocess spent oils on site for re-use $13,650 $11,650 - - $4,050
-
gal
$(-600.0) - $10,200
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $714 $500 $667
19,050
kWh
$47 - - - -
04 2.4224: Upgrade controls on compressors $28,840 $7,000 $26,953
770,223
kWh
$1,887 - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $15,955 - $14,912
426,143
kWh
$1,043 - - - -
06 4.711: Initiate a total quality management program $93,536 $30,000 $92,865
1,897,421
kWh
$671 - - - -
07 4.441: Install automatic packing equipment $144,500 $150,000 - - - $144,500 - -
08 2.4221: Install compressor air intakes in coolest locations $14,950 $4,740 $14,950
426,436
kWh
- - - - -
TOTAL RECOMMENDED $317,425 $203,890 $150,347
3,539,273
kWh
$3,648 $4,050
-
gal
$143,900 $5,280 $10,200
TOTAL IMPLEMENTED $64,439 $19,150 $42,532
1,215,416
kWh
$2,977 $4,050
-
gal
$(-600.0) $5,280 $10,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs