Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

516

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dyeing and finishing textiles, except wool fabrics
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
HO0132 #05 Y:1996 Install / repair insulation on steam lines $5,862 $2,993
HO0132 #04 Y:1996 Use waste heat from hot flue gases to preheat $23,949 $13,764
HO0132 #03 Y:1996 Install occupancy sensors $122 $400
HO0132 #02 Y:1996 Use most efficient type of electric motors $688 $937
HO0132 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $5,509 $16,309
TN0580 #05 Y:1996 Install compressor air intakes in coolest locations $278 $170
TN0580 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $811 $394
TN0580 #03 Y:1996 Install timers and/or thermostats $3,848 $520
TN0580 #02 Y:1996 Utilize energy-efficient belts and other improved mechanisms $5,167 $5,110
TN0580 #01 Y:1996 Use filter and drying oven to reduce sludge volume $18,501 $38,600
OD0053 #07 Y:1996 Increase amount of waste recovered for resale $163,438 $36,960
OD0053 #06 Y:1996 Install / repair insulation on condensate lines $757 $1,534
OD0053 #05 Y:1996 Analyze flue gas for proper air/fuel ratio $20,340 $700
OD0053 #04 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $12,848 $1,600
OD0053 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,177 $4,271
OD0053 #02 Y:1996 Utilize energy-efficient belts and other improved mechanisms $9,634 $13,680
OD0053 #01 Y:1996 Use most efficient type of electric motors $12,083 $3,453
NC0051 #09 Y:1995 Analyze flue gas for proper air/fuel ratio $6,325 $3,800
NC0051 #08 Y:1995 Use a less expensive method of waste removal $24,714 $18,000
NC0051 #07 Y:1995 Use a less expensive method of waste removal $3,190 -