ITAC Assessment: NC0051
ITAC logo
ITAC Assessment: NC0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Dyed and Finished Knitted Cloth
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 249,000
ft2
Annual Production 12,500,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $994,856 17,272,568
kWh
Natural Gas $375,347 123,503
MMBtu
Wood $241,352 189,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,606

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $2,276 $570 $2,276
39,859
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,978 $420 $1,978
34,584
kWh
- - - -
03 2.6212: Turn off equipment during breaks, reduce operating time $6,450 $12,000 $6,450
113,130
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $6,438 $4,430 $6,438
112,837
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,206 $1,960 $3,206
48,652
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,236 $3,200 $14,236
268,464
kWh
- - - -
07 3.6192: Use a less expensive method of waste removal $3,190 - - - - $3,190
-
lb
-
08 3.6192: Use a less expensive method of waste removal $24,714 $18,000 - - $3,914
-
MMBtu
- $20,800
-
lb
09 2.1233: Analyze flue gas for proper air/fuel ratio $6,325 $3,800 - $6,325
-
MMBtu
- - -
TOTAL RECOMMENDED $68,813 $44,380 $34,584
617,526
kWh
$6,325
-
MMBtu
$3,914
-
MMBtu
$3,190
-
lb
$20,800
-
lb
TOTAL IMPLEMENTED $11,606 $4,850 $8,416
147,421
kWh
- - $3,190
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs