ITAC Assessment: OD0053
ITAC logo
ITAC Assessment: OD0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Dyed and finished fabric
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 323
Plant Area 277,000
ft2
Annual Production 96,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,208 15,100,235
kWh
Electricity Demand $278,861 28,831
kW-mo/yr
Electricity Fees $63,186 -
LPG $406,248 85,688
MMBtu
Fuel Oil #6 $769,847 313,599
MMBtu
Coal $27,225 21,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Coal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $12,083 $3,453 $8,299
274,033
kWh
$3,784
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,634 $13,680 $6,704
221,278
kWh
$2,930
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,177 $4,271 $809
26,084
kWh
$368
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,848 $1,600 $12,848
424,091
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $20,340 $700 - - $20,340
-
MMBtu
- -
06 2.2122: Install / repair insulation on condensate lines $757 $1,534 - - $488
-
MMBtu
$269
-
MMBtu
-
07 3.5313: Increase amount of waste recovered for resale $163,438 $36,960 - - - - $163,438
-
lb
TOTAL RECOMMENDED $220,277 $62,198 $28,660
945,486
kWh
$7,082
-
kW-mo/yr
$20,828
-
MMBtu
$269
-
MMBtu
$163,438
-
lb
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Coal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs