ITAC Assessment: GT0433
ITAC logo
ITAC Assessment: GT0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COTTON HOSIERY
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,128 2,517,292
kWh
Natural Gas $170,171 32,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,535 $1,000 $5,535
65,358
kWh
-
02 2.4133: Use most efficient type of electric motors $553 $2,462 $553
6,448
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $225 $800 $225
2,638
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,810 $1,000 $1,810
21,395
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $1,900 $500 $1,900
22,567
kWh
-
06 2.2136: Install / repair insulation on steam lines $6,770 $1,990 - $6,770
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,390 $1,000 - $1,390
-
MMBtu
08 2.2449: Recover heat from exhausted steam, hot air or hot water $24,470 $53,000 - $24,470
-
MMBtu
09 2.4322: Use or replace with energy efficient substitutes $2,010 $6,240 - $2,010
-
MMBtu
TOTAL RECOMMENDED $44,663 $67,992 $10,023
118,406
kWh
$34,640
-
MMBtu
TOTAL IMPLEMENTED $44,663 $67,992 $10,023
118,406
kWh
$34,640
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs