| Assessment Year | 1991 |
|---|---|
| Principal Product | COTTON HOSIERY |
| NAICS |
n/a
|
| SIC | 2252: Hosiery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $213,128 | 2,517,292 |
kWh
|
$0.085 |
| Natural Gas | $170,171 | 32,618 |
MMBtu
|
$5.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,663 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,535 | $1,000 |
$5,535
65,358
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $553 | $2,462 |
$553
6,448
kWh
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $225 | $800 |
$225
2,638
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,810 | $1,000 |
$1,810
21,395
kWh
|
- | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $1,900 | $500 |
$1,900
22,567
kWh
|
- | |
| 06 | 2.2136: Install / repair insulation on steam lines | $6,770 | $1,990 | - |
$6,770
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,390 | $1,000 | - |
$1,390
-
MMBtu
|
|
| 08 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $24,470 | $53,000 | - |
$24,470
-
MMBtu
|
|
| 09 | 2.4322: Use or replace with energy efficient substitutes | $2,010 | $6,240 | - |
$2,010
-
MMBtu
|
|
| TOTAL RECOMMENDED | $44,663 | $67,992 |
$10,023
118,406
kWh
|
$34,640
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $44,663 | $67,992 |
$10,023
118,406
kWh
|
$34,640
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs