Assessment Year | 2017 |
---|---|
Principal Product | Grinding Wheels |
NAICS | 327910: Abrasive Product Manufacturing |
SIC | 3291: Abrasive Products |
Sales Range | $50 M to 100M |
# of Employees | 117 |
Plant Area |
153,578
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $197,815 | 6,550,320 |
kWh
|
$0.030 | |
Electricity Demand | $103,152 | 12,867 |
kW-mo/yr
|
$8.02 | |
Waste Disposal Costs | |||||
Water Usage | $15,740 | 5,501,000 |
Tgal
|
$0.003 | |
Water Disposal | $20,073 | 5,226 |
Tgal
|
$3.84 | |
TOTAL YEARLY COSTS | $336,780 | ||||
RECOMMENDED SAVINGS* | $69,007 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $61,497 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,558 | $3,000 |
$34,558
1,144,348
kWh
|
- | - | |
02 | 2.3212: Optimize plant power factor | $5,927 | $22,500 | - |
$5,927
-
kW-mo/yr
|
- | |
03 | 3.5318: Recycle fluorescent lamps | $10,606 | $23,530 |
$10,606
351,199
kWh
|
- | - | |
04 | 3.4155: Meter waste water | $6,760 | $2,650 | - | - |
$6,760
-
Tgal
|
|
05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $5,572 | $500 |
$5,572
184,521
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $4,304 | $6,855 |
$4,304
142,517
kWh
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $750 | $2,212 | - | - |
$750
-
Tgal
|
|
08 | 2.2511: Insulate bare equipment | $421 | $38 |
$421
13,927
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $109 | $195 |
$109
3,614
kWh
|
- | - | |
TOTAL RECOMMENDED | $69,007 | $61,479 |
$55,570
1,840,125
kWh
|
$5,927
-
kW-mo/yr
|
$7,510
-
Tgal
|
||
TOTAL IMPLEMENTED | $61,497 | $56,617 |
$55,570
1,840,125
kWh
|
$5,927
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs