380
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0175 #06 Y:2020 | 06 | 2020 | Eliminate or reduce compressed air usage | $2,780 | $7,027 | |
| UU0175 #05 Y:2020 | 05 | 2020 | Minimize condenser cooling water temperature | $4,532 | $6,178 | |
| UU0175 #04 Y:2020 | 04 | 2020 | Eliminate or reduce compressed air usage | $5,660 | $6,931 | |
| UU0175 #03 Y:2020 | 03 | 2020 | Replace boiler | $8,979 | $46,872 | |
| UU0175 #02 Y:2020 | 02 | 2020 | Use computer programs to optimize hvac performance | $31,653 | $35,841 | |
| UU0175 #01 Y:2020 | 01 | 2020 | Eliminate/reduce an operation | $154,852 | $42,000 | |
| GT0921 #05 Y:2018 | 05 | 2018 | Utilize higher efficiency lamps and/or ballasts | $6,972 | $32,568 | |
| GT0921 #04 Y:2018 | 04 | 2018 | Reduce the pressure of compressed air to the minimum required | $947 | $3,500 | |
| GT0921 #03 Y:2018 | 03 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $543 | $847 | |
| GT0921 #02 Y:2018 | 02 | 2018 | Install occupancy sensors | $1,446 | $1,974 | |
| GT0921 #01 Y:2018 | 01 | 2018 | Install heat pipes / raise cooling setpoint | $6,221 | $200 | |
| CL1804 #05 Y:2018 | 05 | 2018 | Use cooling tower or economizer to replace chiller cooling | $34,121 | $34,121 | |
| CL1804 #04 Y:2018 | 04 | 2018 | Use flow control valves on equipment to optimize water use | $39,409 | $3,050 | |
| CL1804 #03 Y:2018 | 03 | 2018 | Use waste heat from hot flue gases to preheat | $42,335 | $15,500 | |
| CL1804 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $46,306 | $184,601 | |
| CL1804 #01 Y:2018 | 01 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $156,853 | $28,500 | |
| CL1706 #03 Y:2017 | 03 | 2017 | Install occupancy sensors | $1,345 | $623 | |
| CL1706 #02 Y:2017 | 02 | 2017 | Utilize higher efficiency lamps and/or ballasts | $37,574 | $139,384 | |
| CL1706 #01 Y:2017 | 01 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $66,077 | $125,000 | |
| NC0493 #13 Y:2013 | 13 | 2013 | Condense operation into one building | $21,473 | $10,000 |