ITAC Assessment: GT0921
ITAC logo
ITAC Assessment: GT0921
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bed and Bath Textiles
NAICS 314120: Curtain and Linen Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area 246,935
ft2
Annual Production 180,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,683 2,190,892
kWh
Natural Gas $8,923 895
MMBtu
TOTAL YEARLY COSTS $175,605
RECOMMENDED SAVINGS* $16,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7272: Install heat pipes / raise cooling setpoint $6,221 $200 $6,221
77,763
kWh
02 2.7135: Install occupancy sensors $1,446 $1,974 $1,446
18,069
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $543 $847 $543
6,789
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $947 $3,500 $947
11,835
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,972 $32,568 $6,972
87,149
kWh
TOTAL RECOMMENDED $16,129 $39,089 $16,129
201,604
kWh
TOTAL IMPLEMENTED $947 $3,500 $947
11,835
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs