Assessment Year | 2021 |
---|---|
Principal Product | Textiles |
NAICS | 315190: Other Apparel Knitting Mills |
SIC | 2211: Broadwoven Fabric Mills, Cotton |
Sales Range | $50 M to 100M |
# of Employees | 700 |
Plant Area |
350,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 5,220
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $224,373 | 5,904,000 |
kWh
|
$0.038 | |
Electricity Demand | $254,170 | 14,991 |
kW-mo/yr
|
$16.95 | |
Electricity Fees | $38,198 | - |
|
- | |
Natural Gas | $103,636 | 31,938 |
MMBtu
|
$3.24 | |
Waste Disposal Costs | |||||
Water Usage | $11,802 | 5,726 |
Tgal
|
$2.06 | |
Water Disposal | $26,986 | 6,609 |
Tgal
|
$4.08 | |
TOTAL YEARLY COSTS | $659,165 | ||||
RECOMMENDED SAVINGS* | $208,456 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $200,016 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $154,852 | $42,000 |
$11,092
291,902
kWh
|
$27,467
-
kW-mo/yr
|
- | $675,000 | $(-558,707.0) | |
02 | 2.7226: Use computer programs to optimize hvac performance | $31,653 | $35,841 |
$31,653
832,961
kWh
|
- | - | - | - | |
03 | 2.1224: Replace boiler | $8,979 | $46,872 | - | - |
$8,979
-
MMBtu
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $5,660 | $6,931 |
$5,660
148,919
kWh
|
- | - | - | - | |
05 | 2.2623: Minimize condenser cooling water temperature | $4,532 | $6,178 |
$2,235
58,813
kWh
|
$2,297
-
kW-mo/yr
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,780 | $7,027 |
$2,780
73,151
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $208,456 | $144,849 |
$53,420
1,405,746
kWh
|
$29,765
-
kW-mo/yr
|
$8,979
-
MMBtu
|
$675,000 | $(-558,707.0) | ||
TOTAL IMPLEMENTED | $200,016 | $130,891 |
$44,980
1,183,676
kWh
|
$29,765
-
kW-mo/yr
|
$8,979
-
MMBtu
|
$675,000 | $(-558,707.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs