ITAC Assessment: UU0175
ITAC logo
ITAC Assessment: UU0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Textiles
NAICS 315190: Other Apparel Knitting Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 350,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,220
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,373 5,904,000
kWh
Electricity Demand $254,170 14,991
kW-mo/yr
Electricity Fees $38,198 -
Natural Gas $103,636 31,938
MMBtu
Waste Disposal Costs
Water Usage $11,802 5,726
Tgal
Water Disposal $26,986 6,609
Tgal
TOTAL YEARLY COSTS $659,165
RECOMMENDED SAVINGS* $208,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $200,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 3.1161: Eliminate/reduce an operation $154,852 $42,000 $11,092
291,902
kWh
$27,467
-
kW-mo/yr
- $675,000 $(-558,707.0)
02 2.7226: Use computer programs to optimize hvac performance $31,653 $35,841 $31,653
832,961
kWh
- - - -
03 2.1224: Replace boiler $8,979 $46,872 - - $8,979
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $5,660 $6,931 $5,660
148,919
kWh
- - - -
05 2.2623: Minimize condenser cooling water temperature $4,532 $6,178 $2,235
58,813
kWh
$2,297
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $2,780 $7,027 $2,780
73,151
kWh
- - - -
TOTAL RECOMMENDED $208,456 $144,849 $53,420
1,405,746
kWh
$29,765
-
kW-mo/yr
$8,979
-
MMBtu
$675,000 $(-558,707.0)
TOTAL IMPLEMENTED $200,016 $130,891 $44,980
1,183,676
kWh
$29,765
-
kW-mo/yr
$8,979
-
MMBtu
$675,000 $(-558,707.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs