ITAC Assessment: DL0113
ITAC logo
ITAC Assessment: DL0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fresh and frozen seafood
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 9,999,999
units
Production Hrs. Annual 6,864
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $826,412 8,563,200
kWh
Natural Gas $602,202 103,087
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 3.4115: Recover and reuse cooling water $33,000 $135,000 - - $33,000
-
Tgal
02 2.2136: Install / repair insulation on steam lines $3,884 $2,770 - $3,884
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $7,300 $4,043 - $7,300
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $2,800 $7,588 - $2,800
-
MMBtu
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $25,100 $9,800 - $25,100
-
MMBtu
-
06 2.4224: Upgrade controls on compressors $8,270 $7,000 $8,270
85,500
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,030 $18,354 $9,030
93,076
kWh
- -
TOTAL RECOMMENDED $89,384 $184,555 $17,300
178,576
kWh
$39,084
-
MMBtu
$33,000
-
Tgal
TOTAL IMPLEMENTED $15,714 $28,712 $9,030
93,076
kWh
$6,684
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs