1,586
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Food preparations, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UC2606 #08 Y:2026 | 08 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $3,684 | $500 |
n/a
|
| UC2606 #07 Y:2026 | 07 | 2026 | Adjust burners for efficient operation | $676 | $800 |
n/a
|
| UC2606 #06 Y:2026 | 06 | 2026 | Use waste heat from hot flue gases to preheat | $2,247 | $10,000 |
n/a
|
| UC2606 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $258 | $1,320 |
n/a
|
| UC2606 #04 Y:2026 | 04 | 2026 | Install / repair insulation on steam lines | $1,776 | $2,656 |
n/a
|
| UC2606 #03 Y:2026 | 03 | 2026 | Insulate bare equipment | $284 | $902 |
n/a
|
| UC2606 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $190 | $98 |
n/a
|
| UC2606 #01 Y:2026 | 01 | 2026 | Pay utility bills on time | $7,137 | - |
n/a
|
| SJ0048 #07 Y:2026 | 07 | 2026 | Reduce space conditioning during non-working hours | $1,595 | - |
n/a
|
| SJ0048 #06 Y:2026 | 06 | 2026 | Re-use or recycle hot or cold process exhaust air | $1,791 | $1,127 |
n/a
|
| SJ0048 #05 Y:2026 | 05 | 2026 | Utilize higher efficiency lamps and/or ballasts | $6,383 | $15,726 |
n/a
|
| SJ0048 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,357 | - |
n/a
|
| SJ0048 #03 Y:2026 | 03 | 2026 | Utilize controls to operate equipment only when needed | $5,082 | $13 |
n/a
|
| SJ0048 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $2,105 | $1,983 |
n/a
|
| SJ0048 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $1,488 | $7,009 |
n/a
|
| DL0272 #03 Y:2026 | 03 | 2026 | Minimize water usage | $248,000 | $200,000 |
n/a
|
| DL0272 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $26,591 | $100,000 |
n/a
|
| DL0272 #01 Y:2026 | 01 | 2026 | Install vinyl strip / high speed / air curtain doors | $174,975 | $104,000 |
n/a
|
| UL2603 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $10,696 | $20,685 |
n/a
|
| UL2603 #06 Y:2026 | 06 | 2026 | Reduce illumination to minimum necessary levels | $7,891 | - |
n/a
|