Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,504

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food preparations, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0804 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $634 -
OR0804 #05 Y:2024 Insulate bare equipment $1,439 $4,063
OR0804 #04 Y:2024 Use or replace with energy efficient substitutes $8,678 $51,877
OR0804 #03 Y:2024 Analyze flue gas for proper air/fuel ratio $5,461 -
OR0804 #02 Y:2024 Increase efficiency of trucks $473,339 $1,593,482
OR0804 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $27,473 $22,751
MZ0359 #06 Y:2024 Use excess cold process fluid for industrial cooling needs $4,846 $17,804
MZ0359 #05 Y:2024 Install vinyl strip / high speed / air curtain doors $2,952 $1,511
MZ0359 #04 Y:2024 Install compressor air intakes in coolest locations $7,203 $14,000
MZ0359 #03 Y:2024 Install occupancy sensors $609 $1,400
MZ0359 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $679 $620
MZ0359 #01 Y:2024 Lower temperature during the winter season and vice-versa $1,403 $3,100
LE0579 #05 Y:2024 Replace boiler $96,643 $400,000
LE0579 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $12,804 $49,222
LE0579 #03 Y:2024 Install compressor air intakes in coolest locations $2,383 $5,000
LE0579 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,704 $2,300
LE0579 #01 Y:2024 Install occupancy sensors $1,555 $510
TR0056 #03 Y:2024 Apply for tax-free status for energy purchases $6,902 $2,500
TR0056 #02 Y:2024 Use solar heat for heat $45,845 $271,563
TR0056 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,264 $1,159