ITAC Assessment: UW2501
ITAC logo
ITAC Assessment: UW2501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Soups, Meats, Sauces
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 385
Plant Area 300,000
ft2
Annual Production 3,100,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,278,627 17,047,200
kWh
Electricity Demand $207,487 31,879
kW-mo/yr
Electricity Fees $11,857 -
Natural Gas $304,077 101,314
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $594,597 15,000,000
lb
TOTAL YEARLY COSTS $2,396,645
RECOMMENDED SAVINGS* $164,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $52,448 $25,000 $46,874
624,982
kWh
$5,574
-
kW-mo/yr
-
02 2.2113: Repair or replace steam traps $83,082 $9,800 - - $83,082
-
MMBtu
03 2.7135: Install occupancy sensors $8,699 $6,545 $7,765
103,531
kWh
$934
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,175 $10,269 $11,758
156,777
kWh
$1,417
-
kW-mo/yr
-
05 4.652: Replace existing equipment with more suitable substitutes $6,682 $32,756 $6,616
88,213
kWh
$66
-
kW-mo/yr
-
TOTAL RECOMMENDED $164,086 $84,370 $73,013
973,503
kWh
$7,991
-
kW-mo/yr
$83,082
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs