| Assessment Year | 2025 |
|---|---|
| Principal Product | Soups, Meats, Sauces |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 385 |
| Plant Area |
300,000
ft2
|
| Annual Production | 3,100,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,278,627 | 17,047,200 |
kWh
|
$0.075 | |
| Electricity Demand | $207,487 | 31,879 |
kW-mo/yr
|
$6.51 | |
| Electricity Fees | $11,857 | - |
|
- | |
| Natural Gas | $304,077 | 101,314 |
MMBtu
|
$3.00 | |
| Waste Disposal Costs | |||||
| Solid Waste (non-haz) | $594,597 | 15,000,000 |
lb
|
$0.040 | |
| TOTAL YEARLY COSTS | $2,396,645 | ||||
| RECOMMENDED SAVINGS* | $153,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $41,957 | $25,000 |
$37,499
499,986
kWh
|
$4,458
-
kW-mo/yr
|
- | |
| 02 | 2.2113: Repair or replace steam traps | $83,082 | $9,800 | - | - |
$83,082
-
MMBtu
|
|
| 03 | 2.7135: Install occupancy sensors | $8,699 | $6,545 |
$7,765
103,531
kWh
|
$934
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,175 | $10,269 |
$11,758
156,777
kWh
|
$1,417
-
kW-mo/yr
|
- | |
| 05 | 4.652: Replace existing equipment with more suitable substitutes | $6,682 | $32,756 |
$6,616
88,213
kWh
|
$66
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $153,595 | $84,370 |
$63,638
848,507
kWh
|
$6,875
-
kW-mo/yr
|
$83,082
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs