Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

214

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Roasted coffee
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0267 #05 Y:1996 Recover and reuse cooling water $6,110 $4,380
AM0267 #04 Y:1996 Meter waste water $9,790 $2,200
AM0267 #03 Y:1996 Utilize controls to operate equipment only when needed $2,040 $2,500
AM0267 #02 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $2,640 $1,000
AM0267 #01 Y:1996 Optimize plant power factor $27,300 $65,100
OK0481 #07 Y:1995 Insulate bare equipment $77 $31
OK0481 #06 Y:1995 Install compressor air intakes in coolest locations $101 $180
OK0481 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $168 $277
OK0481 #04 Y:1995 Turn off equipment when not in use $313 $255
OK0481 #03 Y:1995 Install spectral reflectors / delamp $325 $140
OK0481 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $368 -
OK0481 #01 Y:1995 Install occupancy sensors $537 $1,584
OD0034 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $8,560 $14,940
OD0034 #04 Y:1995 Install compressor air intakes in coolest locations $1,517 $500
OD0034 #03 Y:1995 Utilize energy-efficient belts and other improved mechanisms $4,941 $3,025
OD0034 #02 Y:1995 Use most efficient type of electric motors $6,752 $83
OD0034 #01 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $72,922 $168,455
MO0158 #09 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $229 $500
MO0158 #08 Y:1995 Reduce hot water temperature to the minimum required $170 $20
MO0158 #07 Y:1995 Use / purchase optimum sized compressor $6,040 $182