ITAC Assessment: OD0034
ITAC logo
ITAC Assessment: OD0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product coffee
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 145,000,000
lb
Production Hrs. Annual 7,056
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $762,994 16,735,346
kWh
Natural Gas $330,479 142,084
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,253

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $72,922 $168,455 $72,922
1,599,648
kWh
02 2.4133: Use most efficient type of electric motors $6,752 $83 $6,752
148,007
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,941 $3,025 $4,941
108,148
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,517 $500 $1,517
33,118
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,560 $14,940 $8,560
187,866
kWh
TOTAL RECOMMENDED $94,692 $187,003 $94,692
2,076,787
kWh
TOTAL IMPLEMENTED $20,253 $18,048 $20,253
444,021
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs