ITAC Assessment: SU0585
ITAC logo
ITAC Assessment: SU0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 205
Plant Area 125,000
ft2
Annual Production 776,789,970
pieces
Production Hrs. Annual 8,712
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,010 8,624,157
kWh
Electricity Demand $317,223 29,080
kW-mo/yr
Electricity Fees $115,867 -
Natural Gas $9,554 1,055
MMBtu
Other Gas $1,139 1
MMBtu
Waste Disposal Costs
Water Usage $23,266 5,195
Tgal
TOTAL YEARLY COSTS $1,007,059
RECOMMENDED SAVINGS* $69,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,769 $136 $13,769
218,553
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,902 $136 $1,902
30,187
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $1,333 $105 $907
14,400
kWh
$982
-
kW-mo/yr
$(-556.4)
-
MMBtu
-
04 2.5117: Convert to indirect temperature control system $49,190 $284,250 $27,001
431,208
kWh
$15,861
-
kW-mo/yr
$478
-
MMBtu
$5,850
05 2.7447: Install vinyl strip / high speed / air curtain doors $292 $2,044 - - $292
-
MMBtu
-
06 2.7232: Replace existing hvac unit with high efficiency model $2,533 $25,972 $692
10,980
kWh
- $1,841
-
MMBtu
-
TOTAL RECOMMENDED $69,017 $312,643 $44,270
705,328
kWh
$16,843
-
kW-mo/yr
$2,054
-
MMBtu
$5,850
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs