ITAC Assessment: AM0267
ITAC logo
ITAC Assessment: AM0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Coffee, Tea
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $100
M
to 500
M
# of Employees 234
Plant Area 250,000
ft2
Annual Production 63,000,000
lb
Production Hrs. Annual 4,277
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,850 7,765,240
kWh
Electricity Demand $132,380 19,507
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.3212: Optimize plant power factor $27,300 $65,100 - $27,300
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,640 $1,000 $2,640
131,887
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $2,040 $2,500 $2,040
102,579
kWh
- -
04 3.4155: Meter waste water $9,790 $2,200 - - $9,790
-
Tgal
05 3.4115: Recover and reuse cooling water $6,110 $4,380 - - $6,110
-
Tgal
TOTAL RECOMMENDED $47,880 $75,180 $4,680
234,466
kWh
$27,300
-
kW-mo/yr
$15,900
-
Tgal
TOTAL IMPLEMENTED $41,770 $70,800 $4,680
234,466
kWh
$27,300
-
kW-mo/yr
$9,790
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs