ITAC Assessment: OK0481
ITAC logo
ITAC Assessment: OK0481
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Coffee, Cocoa, Tea and spices
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 1,600,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,943 323,857
kWh
Natural Gas $16,054 3,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $537 $1,584 $537
7,327
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $368 - $368
5,569
kWh
-
03 2.7144: Install spectral reflectors / delamp $325 $140 $325
4,396
kWh
-
04 2.6218: Turn off equipment when not in use $313 $255 $313
4,396
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $168 $277 $168
2,345
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $101 $180 $101
1,465
kWh
-
07 2.2511: Insulate bare equipment $77 $31 - $77
-
MMBtu
TOTAL RECOMMENDED $1,889 $2,467 $1,812
25,498
kWh
$77
-
MMBtu
TOTAL IMPLEMENTED $1,711 $2,256 $1,711
24,033
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs