Assessment Year | 2004 |
---|---|
Principal Product | Fabric for automobiles |
NAICS | 313310: Textile and Fabric Finishing Mills |
SIC | 2258: Lace and Warp Knit Fabric Mills |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
300,000
ft2
|
Annual Production | 11,026
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $290,121 | 8,160,000 |
kWh
|
$0.036 |
Electricity Demand | $159,315 | 22,162 |
kW-mo/yr
|
$7.19 |
Natural Gas | $597,250 | 75,256 |
MMBtu
|
$7.94 |
LPG | $418,000 | 50,634 |
MMBtu
|
$8.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $194,441 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $84,488 | $67,500 | - | - | - |
$84,488
-
Tgal
|
|
02 | 3.4115: Recover and reuse cooling water | $7,258 | $8,763 |
$(-121.0)
(-3,450)
kWh
|
$(-55.0)
-
kW-mo/yr
|
- |
$7,434
-
Tgal
|
|
03 | 3.4115: Recover and reuse cooling water | $29,869 | $5,075 | - | - | - |
$29,869
-
Tgal
|
|
04 | 3.4156: Use flow control valves on equipment to optimize water use | $956 | $1,380 | - | - | - |
$956
-
Tgal
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $48,918 | $20,000 | - | - |
$48,918
-
MMBtu
|
- | |
06 | 2.1133: Adjust burners for efficient operation | $9,991 | $1,000 | - | - |
$9,991
-
MMBtu
|
- | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $11,507 | $23,675 |
$11,507
328,764
kWh
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,454 | $500 |
$998
28,500
kWh
|
$456
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $194,441 | $127,893 |
$12,384
353,814
kWh
|
$401
-
kW-mo/yr
|
$58,909
-
MMBtu
|
$122,747
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs