ITAC Assessment: TN0683
ITAC logo
ITAC Assessment: TN0683
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product cabinet doors
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 46,000
ft2
Annual Production 45
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,567 1,573,564
kWh
Electricity Demand $15,014 4,080
kW-mo/yr
Electricity Fees $5,291 -
Natural Gas $6,404 885
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.1191: Change procedures / equipment / operating conditions $25,630 $892 - - - $25,630
-
gal
- -
02 4.421: Modify current incentive program $58,500 $66,430 - - - - - $58,500
03 3.5217: Reuse / recycle/ sell paper products $10,570 $640 - - - - $10,570
-
lb
-
04 2.2437: Recover waste heat from equipment $6,404 $1,350 - - $6,404
-
MMBtu
- - -
05 3.1161: Eliminate/reduce an operation $6,000 $17,000 - - - - $6,000
-
lb
-
06 2.2511: Insulate bare equipment $3,365 $192 $3,365
51,290
kWh
- - - - -
07 2.6218: Turn off equipment when not in use $2,735 $1,580 $2,585
74,443
kWh
$150
-
kW-mo/yr
- - - -
08 2.6232: Install set-back timers $1,425 $2,110 $307
6,448
kWh
- $1,118
-
MMBtu
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $506 - $356
10,258
kWh
$150
-
kW-mo/yr
- - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $197 $352 $142
4,103
kWh
$55
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $115,332 $90,546 $6,755
146,542
kWh
$355
-
kW-mo/yr
$7,522
-
MMBtu
$25,630
-
gal
$16,570
-
lb
$58,500
TOTAL IMPLEMENTED $71,198 $69,532 $805
20,809
kWh
$205
-
kW-mo/yr
$1,118
-
MMBtu
- $10,570
-
lb
$58,500