ITAC Assessment: MO0158
ITAC logo
ITAC Assessment: MO0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Coffee
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $50
M
to 100
M
# of Employees 88
Plant Area 100,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,702 2,466,882
kWh
Natural Gas $114,200 30,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,683 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $(-5,373.0) $4,944 $1,857
28,429
kWh
$(-7,230.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $778 $1,236 $778
12,016
kWh
-
03 2.4133: Use most efficient type of electric motors $3,125 $6,209 $3,125
48,945
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $297 - $297
4,689
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $3,265 $215 $3,265
52,169
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $152 $100 $152
2,345
kWh
-
07 2.4226: Use / purchase optimum sized compressor $6,040 $182 $6,040
93,787
kWh
-
08 2.6121: Reduce hot water temperature to the minimum required $170 $20 $150
2,052
kWh
$20
-
MMBtu
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $229 $500 $296
4,396
kWh
$(-67.0)
-
MMBtu
TOTAL RECOMMENDED $8,683 $13,406 $15,960
248,828
kWh
$(-7,277.0)
-
MMBtu
TOTAL IMPLEMENTED $8,683 $13,406 $15,960
248,828
kWh
$(-7,277.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs