ITAC Assessment: AT0027
ITAC logo
ITAC Assessment: AT0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PRINTED FABRIC
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 85
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,430 900,938
kWh
Natural Gas $132,381 21,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $626 $833 $626
11,723
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $20,500 $300 - $20,500
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $7,553 $8,662 - $7,553
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $217 $250 $217
4,103
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $614 $500 $614
11,723
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $430 $56 $430
8,206
kWh
-
TOTAL RECOMMENDED $29,940 $10,601 $1,887
35,755
kWh
$28,053
-
MMBtu
TOTAL IMPLEMENTED $21,147 $606 $647
12,309
kWh
$20,500
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs