| Assessment Year | 1992 |
|---|---|
| Principal Product | MILK AND PLASTIC BOTTLES |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 66 |
| Plant Area |
n/a
|
| Annual Production | 104,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $218,820 | 5,026,084 |
kWh
|
$0.044 |
| Natural Gas | $42,665 | 15,077 |
MMBtu
|
$2.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,929 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,046 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,410 | $3,576 |
$4,410
101,407
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,046 | $500 | - |
$3,046
-
MMBtu
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,080 | $960 |
$1,080
24,912
kWh
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $994 | $1,200 | - |
$994
-
MMBtu
|
- | |
| 05 | 2.7226: Use computer programs to optimize hvac performance | $463 | $1,400 |
$463
10,551
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $541 | - |
$591
13,482
kWh
|
- | $(-50.0) | |
| 07 | 2.7261: Install timers and/or thermostats | $268 | $600 | - |
$268
-
MMBtu
|
- | |
| 08 | 2.3132: Recharge batteries on during off-peak demand periods | $127 | - |
$127
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $10,929 | $8,236 |
$6,671
150,352
kWh
|
$4,308
-
MMBtu
|
$(-50.0) | ||
| TOTAL IMPLEMENTED | $3,046 | $500 | - |
$3,046
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs