ITAC Assessment: WI0078
ITAC logo
ITAC Assessment: WI0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BOAT SEATS,BOWLING BAGS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,379 674,971
kWh
Natural Gas $22,666 5,101
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $6,074 $500 - $6,074
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $3,496 $16,000 - $3,496
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,659 $1,500 - $1,659
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $975 $500 $975
12,309
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $247 $110
1,465
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $271 $1,000 $271
3,517
kWh
-
07 2.6121: Reduce hot water temperature to the minimum required $146 - - $146
-
MMBtu
TOTAL RECOMMENDED $12,731 $19,747 $1,356
17,291
kWh
$11,375
-
MMBtu
TOTAL IMPLEMENTED $11,646 $19,000 $271
3,517
kWh
$11,375
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs